Selected Work
Portland Art Museum — Pipilotti Rist
Year-long institutional planning phase with international teams
Multi-element installation with motorized projectors, synchronized projection mapping, and surround sound audio. Full AV consulting and facilitation across a complex institutional planning process.
Hauser & Wirth Los Angeles
Seven-year ongoing relationship, multichannel video and sound installations
Broad installation services including full AV consultation, implementation, live event support, and troubleshooting for artists including: David Hammons, Jenny Holzer, Harmony Korine, Mike Kelley, Lucio Fontana, Martin Creed, Paul McCarthy, Jason Rhoads, Mika Rottenberg, Gary Simmons, and Daniel Turner.
One Apple Park Way, Cupertino — Christine Sun Kim
Corporate installation, full AV consulting and implementation
Four-channel video and seven-channel audio installations in Apple campus, coordinated full AV installation within an eight-hour window. Equipment consulting, wiring diagrams, BrightSign programming, and on-site troubleshooting.
Skirball Cultural Center — Trenton Doyle Hancock
360 degree curved projection mapping and BrightSign integration
Three-projector installation within a custom conical circular projection environment, projection mapping, and BrightSign integration. Equipment specification, AV consulting, installation planning and completion, integrated with in-house preparators team.
Jordan Schnitzer Family Foundation — David Hockney
Technology rebuild, remote BrightSign work, AV consulting
Nine-channel video installation re-built on BrightSign architecture for a traveling exhibition. The original system was replaced with a lighter, more flexible solution — smaller footprint, easier to install across multiple venues, and built to travel. Equipment specification, system design, synchronization programming, and installation.
Art + Practice — Justen LeRoy: Lay Me Down in Praise
Exhibition installation with consultation and engineering
Exhibition design implementation for a three-screen installation where ceiling drilling was not permitted. Developed a custom structural solution using a unistrut rack system anchored to the existing H-beam — translating the exhibition designer's drawings into a fully engineered, adjustable hanging system with clean, minimal aesthetics.